Home > News & Media > News > The 8th Lot for the Second Construction Stage of Nuclear Power Plant in China has been shipped from the port of Saint Petersburg.

The 8th Lot for the Second Construction Stage of Nuclear Power Plant in China has been shipped from the port of Saint Petersburg.

By order of the Shipper – JSC “Atomstroyexport” 29 items of equipment have been loaded on board of m/v “PAULA”, with their total weight of 810 tons, including two Steam Generators (318 tons each).

 

As in the case of the previous 7th lot handling, transshipment of Steam Generators has been implemented by means of floating crane “Demag” by the scheme “barge-warehouse-vessel” with their installation on special saddles which have been manufactured by our Company for sea transportation.

 



On 9th of November 2015 in presence of the Consignee’s representatives the shipment has been loaded on board in full volume and on due time.